FAOS KRITIS ENERGY COMMUNITY (limited liability)Rethymno, Crete

Cheaper electricity
for 20 years

A proposal for individuals and companies to join the community's three solar power plants, with virtual net billing.

3 MWthree mature solar power plants
€1 / 4 kWhthe rule of thumb for your amount
1.98 kWhof energy a year for each €1

Who we are

The community

  • Legal form: limited liability energy community under Greek Law 4513/2018, founded in 2023.
  • Seat: Rethymno, Crete; General Commercial Registry (GEMI) no. 169805650000 (Rethymno Chamber).
  • Projects: three solar power plants, 3 MW in total, with final grid connection terms from HEDNO, the Greek distribution network operator.
  • Status: projects ready for construction.

Energy independence means

  • A steadier budget: for the energy that is netted you pay no energy cost, however high wholesale prices go.
  • A say in decisions: you become a member of the community that owns the plants, with a vote in the General Assembly.
  • Modern management: netting every 15 minutes, based on HEDNO's certified meter readings.
  • Long-term planning: an amount sized to your consumption and lower bills for 20 years.

The proposal at a glance

Each individual or company takes part with its own amount and its own electricity supplies (meters).

1

Join with capital

You acquire cooperative shares of €1 each.

2

3 MW of production

Three solar plants, about 4.4 million kWh a year. New members receive the output of 2.5 MW.

3

Cheaper electricity

The energy you consume simultaneously is netted against your electricity bills for 20 years.

Mature projects, with final connection terms from HEDNO

Poros · 1 MW

Municipality of Rethymno

Limnia · 1 MW

Municipality of Apokoronas

Mesa Platanoi · 1 MW

Municipality of Rethymno

Total investment and what each €1 returns

Total investment (excl. VAT on construction)€1,847,408
HEDNO connection fees
for the three plants, including the connection equipment (€2,000 per plant) and VAT (€38,208, to be paid later)
€197,408
Construction of the plants
3 × €550,000 excl. VAT, through an open tender
€1,650,000
Development fee
Existing members keep 490 kW of capacity for developing the investment: permits, projects ready for construction.
€0

New members cover the full cost and receive the energy of 2,509 kW, 83.7% of production. The VAT on construction will be set at a later stage and paid together with the remaining 75% of the participation amount (phase B).

1.98 kWh

energy per year for each €1

€0.23

net benefit in the first year

€6.3

over 20 years: the €1 paid back and €5.3 extra benefit

≈ 23.1%

average annual return (IRR)

4.2 years

of operation until the benefits have paid back the capital

Assumptions: 70% of the energy is consumed simultaneously with production (for a household at 40%: return ≈ 13.7%), netting price €0.15/kWh, electricity prices +4% a year, benefits after operating costs and before taxes. The benefit comes only from the reduction in your electricity bill. Amounts and returns are calculated including the VAT on the connection fees but excluding the VAT on construction.

The key: use power while the sun shines

Electricity consumed simultaneously with its production by the solar plants (per 15-minute interval)

≈ €0.15 / kWh

You save the energy cost; regulated charges (network etc.) are still paid as usual.

Electricity not consumed simultaneously

≈ €0.06 / kWh

The community is compensated for this electricity at the wholesale price set on the energy exchange.

Average annual return (IRR) by simultaneity

Simultaneity: how much of your energy you consume simultaneously with production (per 15-minute interval). Basis of the calculations: 70%.

10.0%30%
13.7%40%
17.1%50%
20.2%60%
23.1%70%

Returns come only from the reduction in your bill; without simultaneous consumption there is no benefit.

Business: up to 70% · Seasonal business: ≈ 65% · Household: ≈ 40%. In winter, the energy allocated to seasonal businesses is generally not consumed simultaneously. The calculations use at most 70%.

What the data show in Greece

Without storage, the share of energy consumed simultaneously with production stays below 70%.

62%

Small business using 45,000 kWh a year with 30 kW of solar: simultaneity 62%. Medium-voltage business: 57.5%.

HELAPCO (Greek PV association), S. Psomas, 2022

≈ 40%

Typical household in Heraklion. HELAPCO example, household using 4,500 kWh with 3 kW of solar: 34%.

Mavromatakis et al., TEI of Crete, ETASR 2018 · HELAPCO 2022

≤ 70%

Five large hotels in Crete (hourly data 2022): solar coverage does not exceed 70%.

Karapidakis, Yfanti et al., HMU, Applied System Innovation 2023

73%

In Crete 73% of a solar plant's output comes from April to October; seasonal hotels operate 5.7 months on average.

Hellenic Chamber of Hotels / ITEP 2023 · Aioliki Gi S.A.

Your amount: the rule of thumb

Participation amount

€1 for every 4 kWh

you consume per year. This gives about 2 kWh per €1 per year, roughly half of your consumption.

Check your supplies

≥ 1.36 kVA

of contracted power (shown on your electricity bill) per €1,000. The smallest supply (8 kVA) covers amounts up to about €5,800.

Participation amount–
Energy per year–
Minimum contracted power–

Indicative calculation using the rule of thumb. The final amount is set in the membership application and is paid 25% by 30 November 2026 and 75% when the construction contract is awarded, together with your share of the VAT on construction. Payments only after the General Assembly of 23 November 2026, into the community's bank account.

Examples

MemberAmountCapacity allocatedSufficient supplySimultaneityYear 1 benefitReturn (IRR)
Household, 6,000 kWh a year€1,5002.0 kWsingle-phase 8 kVA40%€19013.7%
Business, 50,000 kWh a year€12,50017.0 kWthree-phase 25 kVA70%€2,81023.1%
Seasonal business, 500,000 kWh€125,000170 kWthree-phase 250 kVA or medium voltage65%€26,12021.7%

Simultaneity depends on the hours and season in which you use electricity. Benefit in the first year of operation (2028): the reduction in your electricity bill. Netting price €0.15/kWh in 2026, +4% a year.

Process

  1. First step

    Applications, General Assembly, advance payment

    Membership applications, approval by the General Assembly, advance payment of 25% by 30 November 2026.

  2. 4 December 2026

    Connection terms

    Payment to HEDNO (€159,200, plus VAT to be paid later) and signing of the connection contracts.

  3. 2027

    Tender and construction

    Construction of the three plants by a contractor selected through a tender. When the contract is awarded, the remaining 75% is paid, together with the VAT on construction.

  4. 2027–2028 to 2047

    Operation

    20 years of lower electricity bills.

Payment schedule

A. Advance payment of 25% by 30 November 2026.
B. The remaining 75% when the construction contract is awarded, together with the VAT on construction as finally determined.

Anyone who, after a General Assembly decision, does not pay their phase B amount loses the amount paid in phase A.

Membership rules

€1 = 1 share; one vote per member; a cap of 20% per member. The 2,509 kW are allocated to the new members' supplies in proportion to their shares. If more capacity is requested, only the Board and the General Assembly decide which new members are admitted. The annual operating costs of the community and its solar plants will be apportioned and charged to each member according to the percentage of the energy produced that is allocated to their supplies.

Important notice about payments. Payments are valid only after the General Assembly of 23 November 2026 has been completed, and only by deposit into the energy community's bank account, with your full name or company name as the payment reference. Do not pay any money earlier or in any other way.CrediaBank · Beneficiary: FAOS KRITIS ENERGEIAKI KOINOTITA PE
IBAN: GR60 0160 8820 0000 0018 0462 147

What you should know before deciding

If the full amount is not raised

The plants are built in the order Poros, Limnia, Mesa Platanoi, as many as the capital raised covers. The 490 kW of the existing members refer to all three plants; with fewer plants they are reduced proportionally (≈ 163 kW per plant). If the amount raised does not cover the connection fees of any plant, all amounts paid are refunded in full.

The construction cost is an estimate

Estimated at €550,000 per plant, excluding VAT. An application will be made to the Greek tax authority (AADE) for exemption from VAT on the main equipment of the projects; if it is approved, the community will bear only the remaining VAT.

The benefit follows your consumption

If you reduce or stop your consumption, your benefit falls too: for the energy you do not consume simultaneously, the community is compensated at a lower price. Shares can be transferred at their nominal value (€1 per share) to another or new member with electricity supplies, with the approval of the Board and the General Assembly.

Prices and returns may change

The return depends on energy prices (€0.15/kWh in 2026, +4% a year) and on the construction cost.

Next steps

1

Find your consumption

From one year of bills: how many kWh you consume per year.

2

Divide by 4

That many euros is roughly your amount.

3

Check your supplies

Contracted power of at least 1.36 kVA per €1,000.

4

Apply

Membership application with the amount and the numbers of your electricity supplies.

Membership application forms (PDF)

Fill in, sign and send the application with its attachments. The forms are in Greek.

Individual Company / legal entity

Contact

Email: faoscrete@gmail.com

Anastasia Manola · Vice-President of the Board
info@solution-center.gr · Tel. +30 2831 400 777 · Mobile +30 6947 276 373

FAOS Kritis Energy Community (limited liability) · 196 Kountouriotou Ave., 74100 Rethymno, Greece · GEMI 169805650000

Once you express interest, and after a non-disclosure agreement (NDA), the full project file is sent to you.